News & Events

Aug-2011

MBM creates weight a weight

spread spreadsheet that analyses

ALL HEAVY LIFT cargo on a ship

in one go.

Read More > ---------------------------------------------------------

Jul-2011

MBM undertakes analysis for a

shipowner to dry dock a vessel

with cargo.

Read More > ---------------------------------------------------------

May-2011

MBM in Heavy lift magazine -

Training and saving 7 million US

Dollars over 7 years.

Read More > ---------------------------------------------------------

Mar-2011

MBM new employee –

Ruben Bartolome, Naval Architect

joins the Heavy lift team to expand

the cargo analysis division.

Read More > ---------------------------------------------------------

Jan-2011

MBM in the Heavy Lift Magazine

P65 – MBMis the recognised

safety expert with 5 years of no

accidents on all cargo.

Read More > ---------------------------------------------------------

News 2010

Read More > ---------------------------------------------------------

News 2009

Read More >

 

 

Quick Links

BritishShipping Link InternationalMaritimeBureau InternationalMaritimeBureauLink RoyalInstituteOfNavalArchitects TheRoyalInstituteOfNavalArchitectsLink Lloyd'sList LloydsListLink ICCworldBusinessOrganisationLink

> Home >> Past Projects >> 4 x 185 ton RTG's

4 x 185 ton RTG's:

The loading of some cargo’s require more strength analysis than just the final position as can be seen in the loading of the 4 x 185ton RTG’s loaded in China.

 

Plan of cargo in final position on Hold 1.

Plan of cargo in final position on Hold 1

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

The cargo was loaded onto the vessel hatches between the vessel cranes and the aim was to roll the cargo forward or aft to reach their final stowage positions.

 

The hatch covers were initial analysed with a rolling load. This was to determine the strength at each position during the movement as the cargo is driven along a sandwich of wood/steel plates for weight spreading.

 

Cargo rolling on hatch.

Picture of cargo rolling on hatch

 

 

 

 

 

 

 

 

 

 

 

 

The second analysis, is the transfer of the cargo from one Hold 2 to Hold 1 with a maximum distance between holds of 4.5m.

 

A simple “bridge” was confirmed adequate to transport the cargo from Hold 2 to Hold 1.

 

 

“bridge” between Hold2 to Hold 1.

Picture of “bridge” between Hold2 to Hold 1.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

The cargo was loaded, secured and safely transported to the client.

 

 

All 4 x 185ton RTG’s loaded on 12000Dwt MPV.

All 4 x 185ton RTG’s loaded on 12000Dwt MPV between Hold2 to Hold 1.