MBM Consultancy Logo
  • Home
  • About Us
    • Contact Us
    • News and Events
    • Certificates – References
    • Brochure and reports
  • Services
    • Services Overview
    • Vessel services
      • Naval Architecture
        • Naval Architecture Overview
        • Stability & Motions Analysis
        • Structural Analysis
        • Surveys
        • Moorings Analysis
      • Dry-docking
      • BWT
      • Scrubbers
    • Cargo services
      • Method statements / RAMS
      • Lifting Frames
      • Grillages & Transport Frames for Heavy Cargo transportation.
      • Barge Loadouts
      • Marine Surveyors
      • Laser surveys
      • Maritime Consultancy Services
      • Naval Architects for Maritime Industry Sectors
      • Insurance and Accidents
      • Graphical Services
        • CAD Services Overview
        • Vessel & Engineering Drawings
        • 3D Modelling
        • Animations
  • Consultancy studies
    • Heavy Cargo market forecast
    • Port Development Project
    • Crane collapse investigation
    • Technical team creation
  • Vessel projects
    • Vessel Conversions
    • Boatlandings
    • Platforms
    • Bulkheads
    • Accommodation units
    • LNG Vessels
    • 2D Hatch Cover Analysis
    • 3D Model for New Build Vessel
  • Cargo Projects
    • Upright Towers
    • Craddles for Tugs
    • 295t JIB Crane
    • No Steel for reels
    • Innovation for wind energy
    • RTG’s driven on Hatch
    • 2 x Macchi Boiler
  • Project Gallery

Category: New Build Vessel

  • Home
  • /
  • New Build Vessel

Is it practical to undertake Bulbous Bow Modification at five year period Dry-Docking?

By MBM-Marketing

  • 2014 , 2015 , 3D Modelling , New Build Vessel ,
  • 30 Apr

This is potentially only relevant to the forward thinking ship-owners and they have to consider this notion prior to the dry-docking period; so that you can optimize the design, manufacturing and shipping of the new bulbous bow design and utilize the Dry-Docking. Then with the consultant/designer the ship-owner can pre-plan ahead. The benefit of pre-planning

Read More

Mark Bambury held a presentation about „Heavylift Transportation in Offshore Wind“ @ Mariko Center

By MBM-Marketing

  • 2014 , Events , Heavy Lift , New Build Vessel ,
  • 10 Dec

On Tuesday, 25.11.2014, Mr Mark Bambury held a great Presentation at the Mariko Center in Leer. The topic for the Presentation was: “ How innovation in the shipbuilding sector can be adapted to the needs and operational requirements of the offshore-wind-energy.” Over 40 interested people from the industry and students from the University Emden/Leer listened to

Read More

A Multipurpose cargo vessel for global service was reviewed for new build at MBM

By MBM-Marketing

  • 2013 , Heavy Lift , New Build Vessel , Offshore Wind ,
  • 10 Sep

The review to extend a new build vessel was undertaken at MBM. The original vessel design was reviewed based on potential markets and operational conditions to provide an optimum working solution. The focus of the project was on operations. Defining the number of cranes, their frame location, the stability at these frames during lifting operations,

Read More

MBM Consultancy 2021

MBM Consultancy 2021

MBM Consultancy brochure - 2021.
Heavy Cargo Transport Engineering and Naval Architecture Ship Designs.

BWT – MBM Consultancy

MBM Consultancy provide BWT for Shipowners.

MBM Consultancy provide BWT service for shipowners.

MBM Consultancy scrubber services

MBM Consultancy scrubber services

MBM Consultancy provide Shipowners and Shipmanagers with Scrubber surveys, and Naval architecture.

Recent Posts

  • USA BARGE WEATHER ANALYSIS

    USA BARGE WEATHER ANALYSIS

  • MONOPILES FOR TAIWAN

    MONOPILES FOR TAIWAN

  • Tug cylindrical fender and support design.

    Tug cylindrical fender and support design.

  • Breakbulk Bremen 2018

    Breakbulk Bremen 2018

  • Vessel conversions for OSV.

    Vessel conversions for OSV.

Academic links

2006-2020 MBM Consultancy Germany. Powered By Impressive Business WordPress Theme