The steel structure was manufacture into place. MBM conducted a survey to generate 3D model using advanced techniques. The drawings of the platform were created and model used to update the vessel GA. Also a deck strength of the platform was performed. Then the platform was analysed to create a deck stengeh to allow ROV an dive operations to be approved from classifications.

• Vessel survey.
• 3D modelling.
• FEA Analysis.
• Class Approval Drawings.
• Manufacturing Drawings.
• GA updates and modification.

 