Offshore parts are loaded

MBM assist the EPC with their first ever loading of a sea transportation aboard a vessel. The client is familiar with the rules and procedures with barge transportation, but has never transported on a vessel. The rules and process’s for a sea cargo transport to weld, engineer, and secure a cargo on a vessel are not the same and MBM was there to provide valuable advice to make sure this cargo was loaded correctly to the IMO rules and regulations.

Many questions were asked during the loading by the EPC, and MBM was present to explain and direct each action. A successful loading took place and all Class rules were maintained and the vessel sailed without delay.

 

Updated: March 31, 2014 — 8:11 am

Leave a Reply