By MBM-Marketing
MBM submitted their proposal to assist in the design and conversion of an OSV for cable laying. There are two OSV’s to be converted with variance in methodology for cable operations, storage and discharge. One with a fixed carousel and the other with an advanced rotating discharge system.
Each vessel will be used for cable laying on the Baltic/German wind farm projects.
The aim is to have the vessel converted within the Polish shipyards in 2014.
09 August 2020
09 August 2020
11 April 2019
28 August 2018
28 August 2018
30 January 2015
24 September 2014
24 March 2014
Contact us:
MBM Consultancy
Hafenstrasse 6a, Haus Santos
26789 Leer
Germany
Phone + 49 (0) 491 96046407
Email info@mbm-consultancy.com
2006-2020 MBM Consultancy Germany. Powered By Impressive Business WordPress Theme